Home NovaAstrax 360 Understanding ZetaChain Governance Proposal 2 and the ZETA Token Burn Schedule

    Understanding ZetaChain Governance Proposal 2 and the ZETA Token Burn Schedule

    Clarifying the 55 Million ZETA Burn

    While recent reports have highlighted a 55 million ZETA burn associated with ZetaChain, the reality is a phased process rather than a single event. According to Governance Proposal 2, which was published on November 4, the 55 million ZETA represents undistributed validator rewards. Instead of an immediate removal from supply, these tokens will be burned in twelve equal monthly installments of approximately 4.6 million ZETA throughout 2027. This approach ensures the token release schedule remains consistent with previous expectations.

    Migration Details and the L1 Halt

    Building upon the previously approved Proposal 68, which authorized the transition to Solana with 99.4% approval, Proposal 2 outlines the specific technical execution. Voting for this proposal concludes on November 7. If passed, the ZetaChain L1 will reach a snapshot at block 20,755,000, anticipated around December 9. At this height, the L1 will permanently cease operations, and users will be directed to the ZetaHub migration portal to claim their tokens.

    The Snapshot and Claim Process

    The snapshot will capture various states of ZETA holdings, including liquid, staked, and unbonding tokens. Staked assets are included automatically, meaning users do not need to unstake manually. To claim, holders must sign a message linking their original wallet to a Solana address. The process requires no fees and no seed phrases. Users holding ZETA in liquidity pools or smart contracts must exit these positions before the snapshot, as these funds cannot be claimed via the portal. ZRC-20 assets will require a separate process on a dedicated bridge page.

    Security and Solana Integration

    On the Solana network, ZETA will exist as a native SPL token. To protect holders, the total supply will be minted before the portal opens, and the mint authority will be permanently revoked. ZetaChain plans to publish the migration program address and the SPL mint address before the December 9 transition, allowing the community to verify the supply cap. Additionally, the migration portal is undergoing an independent security audit by Hacken.

    Why it matters

    This transition represents a significant pivot for ZetaChain as it moves away from its L1 architecture toward the Solana ecosystem. By opting for a gradual burn and transparent, audit-backed migration, the project aims to minimize market disruption and maintain trust during a complex infrastructure shift.

    LEAVE A REPLY

    Please enter your comment!
    Please enter your name here